Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the iubenda domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6114

Warning: Undefined array key "pf_settings_page_slug" in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-content/themes/amwerk/archive-portfolio.php on line 9
Archives des Loading - Bonnet
 
HomeCategory

Loading

bt_bb_section_top_section_coverage_image

Implementation of a primary station on the CHEMERE ROUANS site for the COLAS group, composed of a 300 m3 reception hopper, a BONNET DAT (drawer feeder) 6018 distributor, a 10 m² BONNET CGB 4521-2 grizzly screen, a METSO C 150 crusher, and a set of 7 belts conveyors connecting the new primary station to the existing installation.

  • Production capacity 7000 tons/day
  • 400 tons of steel