Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the iubenda domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6114
Gudmond - Bonnet
 

Gudmond

Implementation of a train loading facility on the GUDMOND-VILLIERS site for the CEMEX group including a 65 m3 receiving hopper, a belt extractor, a belt conveyor connection and a loading station building with a two-way shuttle for the filling of the wagons.

  • Maximum flow 1000 tons/h
  • 150 tons of steel
Year:
2018
Location:
Grand Est, Haute-Marne