Implementation of a train loading facility on the GUDMOND-VILLIERS site for the CEMEX group including a 65 m3 receiving hopper, a belt extractor, a belt conveyor connection and a loading station building with a two-way shuttle for the filling of the wagons.
- Maximum flow 1000 tons/h
- 150 tons of steel
- Year:
- 2018
- Location:
- Grand Est, Haute-Marne