Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the iubenda domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6114
Saint Broladre - Bonnet
 

Saint Broladre

Implementation of a secondary and tertiary installation on the ST BROLADRE site for the GAGNERAUD group, composed of a set of 18 and 22 m² screens on hoppers, a crushing station, a recomposition set with a storage by stacker on pylon and storage on hoppers for the loading of dry or washed materials

  • Production capacity 3500 tons/day
  • Storage capacity 4500 tons in hoppers – 25,000 tons on the ground
  • 1200 tons of steel
  • 170 m² of screening
  • 750 m of belt conveyors
Year :
2018
Location :
Bretagne, Ille-et-Vilaine