Warning: Undefined array key "pf_settings_page_slug" in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-content/themes/amwerk/archive-portfolio.php on line 9
Settling – Bonnet
 
HomeCategory

Settling

bt_bb_section_top_section_coverage_image

Implementation of a primary station on the CHEMERE ROUANS site for the COLAS group, composed of a 300 m3 reception hopper, a BONNET DAT (drawer feeder) 6018 distributor, a 10 m² BONNET CGB 4521-2 grizzly screen, a METSO C 150 crusher, and a set of 7 belts conveyors connecting the new primary station to the existing installation.

  • Production capacity 7000 tons/day
  • 400 tons of steel
  • more than 600m of belt conveyors