Implementation of a primary station on the CHEMERE ROUANS site for the COLAS group, composed of a 300 m3 reception hopper, a BONNET DAT (drawer feeder) 6018 distributor, a 10 m² BONNET CGB 4521-2 grizzly screen, a METSO C 150 crusher, and a set of 7 belts conveyors connecting the new primary station to the existing installation.
- Production capacity 7000 tons/day
- 400 tons of steel
- more than 600m of belt conveyors