Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the iubenda domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6114

Warning: Undefined array key "pf_settings_page_slug" in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-content/themes/amwerk/archive-portfolio.php on line 9
Archives des Chargement - Bonnet
 
HomeCategory

Chargement

Réalisation d’un poste primaire sur le site de CHEMERE ROUANS pour le groupe COLAS comprenant, une trémie de réception 300 m3, un distributeur BONNET DAT 6018, un scalpeur BONNET CGB 4521-2 de 10 m², un concasseur METSO C 150, ainsi qu’un ensemble de 7 convoyeurs reliant le nouveau poste primaire à l’installation existante.

  • Capacité de production 7000 tonnes/jour
  • 400 tonnes d’acier
  • +600 m de convoyeurs