Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the iubenda domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6114
Laayoune - Bonnet
 

Laayoune

Réalisation de 2 débourbeurs 36×100 sur le site de LAAYOUNE au MAROC pour l’OCP leader mondial pour la production de phosphates.

  • Débit maxi 400 tonnes/h
  • Dimensions 3,6 m de diamètre et 10 m de longueur
  • Matériaux traités Phosphates granulométrie 0,04 – 25 mm
Année:
2016
Lieu:
Morocco