Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hide-my-wp domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hjqs-legal-notice domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the amwerk domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the bold-builder domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-includes/functions.php on line 6121

Warning: Undefined array key "pf_settings_page_slug" in /homepages/38/d540227485/htdocs/clickandbuilds/Prod_v2/wp-content/themes/amwerk/archive-portfolio.php on line 9
Portfolio Archive - Bonnet
 
HomePortfolio

Portfolio Archive - Bonnet

bt_bb_section_top_section_coverage_image

Implementation of a secondary and tertiary installation on the ST BROLADRE site for the GAGNERAUD group, composed of a set of 18 and 22 m² screens on hoppers, a crushing station, a recomposition set with a storage by stacker on pylon and storage on hoppers for the loading of dry or washed materials

  • Production capacity 3500 tons/day
  • Storage capacity 4500 tons in hoppers – 25,000 tons on the ground
  • 1200 tons of steel
  • 170 m² of screening
  • 750 m of belt conveyors

Implementation of a train loading facility on the GUDMOND-VILLIERS site for the CEMEX group including a 65 m3 receiving hopper, a belt extractor, a belt conveyor connection and a loading station building with a two-way shuttle for the filling of the wagons.

  • Maximum flow 1000 tons/h
  • 150 tons of steel

Implementation of a primary station on the CHEMERE ROUANS site for the COLAS group, composed of a 300 m3 reception hopper, a BONNET DAT (drawer feeder) 6018 distributor, a 10 m² BONNET CGB 4521-2 grizzly screen, a METSO C 150 crusher, and a set of 7 belts conveyors connecting the new primary station to the existing installation.

  • Production capacity 7000 tons/day
  • 400 tons of steel
  • more than 600m of belt conveyors

Implementation of two 36×100 rotary scrubbers on the LAAYOUNE site in MOROCCO, for OCP, world leader in phosphate production.

  • Maximum flow 400 tons/h
  • Dimensions: 3.6 m diameter and 10 m length
  • Processed materials: Phosphates granulometry 0,04 – 25 mm